Building Project Update PDF Print E-mail

What a month it has been! With the utilities and storm water in we were able to install the curbing, sidewalks and pavement along 164th Ave. The foundation walls are now complete. We are now preparing to start the 1st floor post-tension slab.  God is good!

Below from left to right: 1) Completed Sidewalk 2) Foundation walls  4) "The Lodge", which will remain a part of the site, is now landscaped.

dsc_1068.jpgp1030243.jpgdsc_1006.jpg
 